Six stages. One accountable team.
No mysterious handoffs between an architect, a contractor, and a stranger you never met. One team, six clear stages, and you approve every one.
Free Quick-Fit Check
You answer five questions. We give you an honest read on whether SB 531 is likely to work on your lot. No cost, no obligation.
Readiness Assessment
Paid on-site feasibility. Setbacks, utilities, septic/sewer, county rules, cost band and design direction — in writing. Credited toward design if you move forward.
Architectural design
Two to three schematic directions, then a single developed design with plans, elevations and finish palette. You approve every stage before we move on.
Engineering & permit set
Structural, MEP, civil (as needed), and the full permit set — ready to file the week SB 531 opens filings, or immediately in ADU-ready counties.
Construction
One accountable superintendent, real weekly updates, and no ghosting. We're VA Class A licensed and insured.
Handover
Final walk, punch, and a warranty package. Rental-ready if that's your goal, family-move-in-ready if that's your goal.