Readiness Assessment

Before we design a thing, we tell you the truth about your lot.

A paid on-site feasibility study that turns a stack of unknowns into a written go / no-go — with a cost band you can actually plan around.

What's included

  • On-site walk with our project lead
  • Setback, easement and buildable-area screen
  • Water, sewer, septic and utility capacity review
  • County rules read (pre and post SB 531)
  • Design direction sketch and program
  • Preliminary cost band in writing
  • Recommended next-step scope + timeline

If we recommend against building, we say so — in writing. If we recommend moving forward, the Readiness Assessment fee is credited toward your design contract.

Request a Readiness Assessment

Frequently asked

What is an ADU Readiness Assessment?+

A paid, on-site feasibility study we run before any design work. It covers an on-site walk, a setback, easement and buildable-area screen, water, sewer, septic and utility capacity, a county rules read before and after SB 531, a design direction sketch, a preliminary cost band in writing, and a recommended next-step scope and timeline.

Is the Readiness Assessment fee credited toward design?+

Yes. If we recommend moving forward and you proceed, the Readiness Assessment fee is credited toward your design contract.

What if my lot will not work for an ADU?+

We tell you so, in writing. We would rather lose a project than sell a homeowner a build that setbacks, septic capacity or county rules will not support.

Do I need a Readiness Assessment before SB 531 takes effect?+

It is the most useful thing you can do in 2026. Verifying feasibility now is what lets you hold engineered, permit-ready plans and file the week SB 531 takes effect on July 1, 2027.